Sign In | Join Free | My ecer.jp
China Henan Dowell Crane Co., Ltd. logo
Henan Dowell Crane Co., Ltd.
To Seek the speed, chase the efficiency, guarantee the quality!
Active Member

7 Years

Home > Launcher Crane >

100Ton Girder Launcher Crane Railway Building Usage 5m / Min For Highway

Henan Dowell Crane Co., Ltd.
Contact Now

100Ton Girder Launcher Crane Railway Building Usage 5m / Min For Highway

Brand Name : Dowellcrane

Model Number : JQJ Beam Launcher Girder Crane

Certification : ISO CE BV CCC GOST SGS

Place of Origin : Henan, China

MOQ : 1 Set

Price : USD 90000-120000 SET

Payment Terms : L/C, T/T, Western Union

Supply Ability : 5000 Sets per Year

Delivery Time : 60days

Packaging Details : Main body packaged by high quality water-proof plastic woven cloths; spare parts are packed in high quality plywood box.

Product Name : girder launcher crane

Color : Customized

Current overload protection system : include

Limited switch : include

Voltage lower protection function : include

Warranty : 2 years

crane travel speed : 5m/min

Rated Lifting Moment : 500kn

Span : 50M

Lifting speed : 0-1m/min

Power supply : 380v 3phase or customized

Contact Now

100Ton Top Quality Railway Building Usage girder launcher crane for highway

girder launcher crane Description

Bridge girder erection machine merges an adaptation of a wide range of work, excellent performance, convenient operation, safety structure into a single whole. It has the steel structure of rail type precast beam hoisting rack equipment. This product can be used not only in plain construction, but also to meet the construction of mountain highway slope, small radius curved bridge, skew bridge and tunnel bridge requirements.

The bridge girder erection machine consists of main girder, crane, front legs, rear legs, front leg cylinder, rear leg cylinder and the transverse connection of front, middle, rear legs. The control part is composed of hydraulic system and electric control system. The bridge girder erection machine is characterized by reasonable compact structure and convenient installation, the main standard girder is connected by pin connection. The double girder structure is connected between the two frame girders by welded pipe.

The bridge girder erection machine not only can meet the standard set up, but also it can meet the cross curve erection, variable span erection, span continuous beam, composite beam, continuous steel etc. In addition to bridge erection, simply supported girder erection and point lifting, it is characterized by good stability, high efficiency, safety and reliability, variable span convenient adjustment and convenient operation and etc.

Related Products

100Ton Girder Launcher Crane Railway Building Usage 5m / Min For Highway

girder launcher crane Parameters

Lifting Weight t 60 80 100 150
bridge radius m 20-30 20-35 30-40 35-50
Slope below 1/20
Turning Radius m 200 250 300 350
Angle of Skew Bridge 0~15°
shop travelling speed lengthways moving
lifting 1 1.2 0.8 0.6
6/0.6
crane travelling speed lengthways moving 6/0.6
sidesway 6/0.6

girder launcher crane Advantages

  • Unique pin connection, firm and reliable, easy to install
  • A-type fracture surface, continuous girder with low center of gravity, convenient and reliable.
  • The machine can accomplish the build of girders with carrying and erection at the same time.
  • Low deflection and high stiffness .
  • Safe and reliable .
  • High efficiency.

girder launcher crane Safety Features

Safety is the most important issue for cranes.To ensure the safety,the following safety devices are equipped in BL crane.
Crane traveling limit switch.
Overload protection device.
Lifting height limit device.
Voltage lower protection function .
Phase sequence protection function.
Emergency stop function.
Rain cover for outside hoist, driving units, electric cubicle.
Warining indicator : flashing nights and warning sounds.
Wire-less infra-detector for anti-collusion.

Packing and Delivery

Packing methods:

1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying;

2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.

Delivery methods:

1. If the size of 150 ton concrete T beam launcher are suitable for container ship, usually by container;

2. If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.

Delivery time:

Within 30 to 40 working days after the receipt of deposit.

Transportation:

generally 35 days to 50 days to destination port.

FAQ

1. What’s the information should I provide when inquiry about the 150 ton concrete T beam launcher?

1.1 We need the Bridge Drawing;the Maximum longitudinal slope and the Maximum Transverse slope;

1.2 The Girder/beam drawing;

2. What are inspection standard for load test of 150 ton concrete T beam launcher?

2.1 Dynamic load test 1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overheat.

2.2 Static load test 1.25 times rated load, all mechanisms work well, the crane stops 20-30 min as trial load is lifted 10 cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation;

3. How to make highway bridge concrete girders?

a. Full span prefabrication.

b. Segment girder prefabrication.

c. Full span cast-in-place girder.

d. Segment cast-in-situ.

4. How about maintenance of 150 ton concrete T beam launcher?

4.1 Lubricating: Working performance and service life of all mechanisms of crane depend on lubricating to a big extent.

4.2 Steel wire rope: Fracture of wire has to be specially noticed. A new steel wire rope has to be changed immediately with the condition of broken wire, broken strands and wear loss to scrapping standard.

4.3 Spreader: The spreader has to be checked regularly.

4.4 Pulley block: Mainly check rope race wearing condition, check whether wheel flange is cracked and whether pulley could get stuck in the axle or not.

4.5 Wheels: Regularly check wheel flange and tread, a new wheel has to be immediately replaced as crack part or wearing in wheel flange reaches 10% of wheel thickness; Re-polishing has to be done as diameters between two driving wheels on tread differs more than D/600, or there are severe scar on the tread.

4.6 Brake: Check one time per shift; The brake should be in accurate movement, and pins do not allow to be stuck. Brake shoes shall fit brake wheels correctly; the brake shoes interval shall be equal to open them.

5. How many Personnel and equipment to assemble 150 ton concrete T beam launcher in the worksite we need?

Personnel: 8 to 10 workers equipment

Truck crane > 50 t : 2 sets

Φ19.5 steel wire rope 8 m: 4 ropes

Sleepers: several

Electric welding machine: 1 set

Oxygen, acetylene: 1 set

Hammer(12 pound and 8 pound): 1 set for each

Wrench and pincher: several

Gradienter: 1 set


Product Tags:

girder launcher crane for highway

      

100Ton Girder Launcher Crane

      

5m/min Girder Launcher Crane

      
Quality 100Ton Girder Launcher Crane Railway Building Usage 5m / Min For Highway wholesale

100Ton Girder Launcher Crane Railway Building Usage 5m / Min For Highway Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Henan Dowell Crane Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)